I am working on a budgetary cost estimate (apx 30%). I have to deliver 250 cfs of water out of a river appx 3 miles to the toe of a dam where it will attach to and outlet from the downstream side of the dam through a sluice pipe. About 2 miles is under about 100 feet of water in a long, narrow reservoir, located off Hwy 70 (a long windy road) in the Sierra Nevada mountain range (CA).
I would like to know what equipment (along with mobilization and construction costs) will be necessary to lay the pipe on the bottom, which will require some dredging to keep a consistant slope for gravity flow. There is about 100 feet of head.
Thanks.