RHTPE
Structural
- Jun 11, 2008
- 702
The 2003 IBC, paragraph 1510.3.3, requires that: "Where the existing roof has two or more applications of any type of roof covering", all existing layers of roof covering must be removed.
I am working with a client who markets a single ply membrane roofing system (no ballast). We contend that the removal of the uppermost roofing membrane (and its ballast if it exists) and its replacement with a new membrane (no ballast system) should be acceptable, assuming that there are no structural deficiencies. The cost savings involved to eliminate the removal of all layers of roofing would be significant.
Does anyone have any thoughts on how to battle a building official on this?
Ralph
Structures Consulting
Northeast USA