Hi,
I am working on a drilled pier foundation in SDC C. Section of IBC 1810.3.13 states the individual drilled pier needs to be interconnected with ties when in SDC C.
My question is
1) Do we need to connect every drilled pier supporting the column with a tie? Is there any way around this other than stated in section 1810.3.13?
2) Has anyone tried using slabs to restrain the drilled pier? Are there any resources which explains detailing and analysis for this?
3) Does this apply to Auger cast piles aswell? When there are two piles connected with pile cap?
Thanks
I am working on a drilled pier foundation in SDC C. Section of IBC 1810.3.13 states the individual drilled pier needs to be interconnected with ties when in SDC C.
My question is
1) Do we need to connect every drilled pier supporting the column with a tie? Is there any way around this other than stated in section 1810.3.13?
2) Has anyone tried using slabs to restrain the drilled pier? Are there any resources which explains detailing and analysis for this?
3) Does this apply to Auger cast piles aswell? When there are two piles connected with pile cap?
Thanks