Hi,
My problem is how to calculate length of light guide and how to make them associative so adding more cable segments in existing structure will give me correct length of new cables? main issue is that i have cluster that start with 50 cables and after some 50-60% of length cables start to branch out on different points, so I am not sure if I should make separate routing for each cable from start point to end or if there is a way to make just one line that would represent longest fiber and then branch out from that route?
Second thing, what is best and most efficient way to export lengths of few hundred cables to excel sheets every time changes are done?
My problem is how to calculate length of light guide and how to make them associative so adding more cable segments in existing structure will give me correct length of new cables? main issue is that i have cluster that start with 50 cables and after some 50-60% of length cables start to branch out on different points, so I am not sure if I should make separate routing for each cable from start point to end or if there is a way to make just one line that would represent longest fiber and then branch out from that route?
Second thing, what is best and most efficient way to export lengths of few hundred cables to excel sheets every time changes are done?