I'm sorry I can't help with your question but thought you might be able to help me with some basic calculations on estimating drawdown and storage volume needed for a dewatering operation we are proposing to excavate a stormwater pond. Although I am an engineer, I haven't done much design work; mostly waste management regulatory and operations work. Can you point me in the right direction? Thanks, Laura