marthab
Civil/Environmental
- Nov 19, 2002
- 24
I was asked to furnish hydraulic grade line calculations for a system of 4 pipes that go from CB to CB. I created a spreadsheet, but I am getting for my last 2 pipes (upstream) the E.G is lower than the invert of the pipe. Is that possible? Also, does anybody know of a spreadsheet that is already developed for this?