HTRI Shell Geometry Output

Status
Not open for further replies.

mectub

Mechanical
Joined
Mar 4, 2009
Messages
22
Location
VE
Hi, anyone could help to understand the meanning of this part of the output summary given by HTRI software, when it says (Shell geometry) Series 1 and Parallel 2, i think this is i need 1 row of 2 equipment in parallel. How if Series 2 and Parallel 5?

 
1 series 2 parallel means you need 2 shells next to each other with 1/2 the flow going into each.

2 series 5 parallel basically means 5 next to each other with one exchanger stacked on top of each (10 total). you'd have 20% of the flow going through each and then going through the exchanger on top.
 
Thanks a lot adamp716,that clear my doubts!!
 