Thomasmac
Industrial
- Jul 21, 2002
- 13
I'm in the throws of designing a triple line buried pipline to run insulated and heat-traced at 120 C. The lines are only 1600m long, 2x4" and 1x6". I would like some information on how best to approach this line as there are probably a few schools of thought out there. We have the AutoPipe Plus software and intend to use this to determine stress levels at bends, although I'm not entirely confident that the results will reflect reality. The route has us crossing a few minor gullies (ie 4m deep) and a couple of horizontal bends along the way which would tend to suggest the pipe could expand into the bends, the insulation however (MDI) only has a compressive strenght of 300KPa so we risk crushing this with too much expansion. Im expecting 700mm of expansion per 500m.