adina1977
Geotechnical
- Jun 3, 2005
- 2
I am trying to design a concrete horseshoe culvert, to be covered by a high embankment using Sap 2000 v10. I am simply too new for it. Please help with startup guidance and then on. I have the loads. I need to determine the sectional forces to enter the reinforced concrete computations. Is there someone with similar experience??? please help.