JNEnginr
Civil/Environmental
- Aug 26, 2008
- 99
Hey Guys,
Any thoughts on placing a construction joint in a shear wall? Would you dowel more than normal at the joint?
I have a footing at -3', and the joint is being placed at the slab +3', so theres 6ft between footing and joint. But there's a door at the slab, so less concrete to transfer the shear. Shear wall has 3 sides, side 1 and 3 are solid and identical and parallel to each other, and side 2 has the door and is perpendicular to the other two walls, and is the one im concerned about.
Let me know if you need more information.
Thanks!
Any thoughts on placing a construction joint in a shear wall? Would you dowel more than normal at the joint?
I have a footing at -3', and the joint is being placed at the slab +3', so theres 6ft between footing and joint. But there's a door at the slab, so less concrete to transfer the shear. Shear wall has 3 sides, side 1 and 3 are solid and identical and parallel to each other, and side 2 has the door and is perpendicular to the other two walls, and is the one im concerned about.
Let me know if you need more information.
Thanks!