TroyD
Structural
- Jan 28, 2011
- 98
I am working on a building addition project. Hollowcore plank will run parallel with the existing wall. Please see attached sketch. Is this an acceptable method of securing the new plank to the existing wall? Existing wall is NOT supporting the plank, but I am trying to pattern this detail after the Spancrete typical detail (also attached). Ideally the expansion anchor would be secured to a bond beam. I propose having the 6" CMU courses above grouted solid (if they are not already). Typically the plank edge is supported on the wall, but that does not seem feasible here. Any advice/input is appreciated.