natka24
Mechanical
- Sep 26, 2003
- 22
Hi,
I've got a problem with building's hight. The first layer of deck is metal deck,trapezoid sheet. There is installed ESFR system. The distance from floor to the bottom of sheet is 13,7m. The height of trapezoid sheet is 135mm. And it is my question:
For ESFR sprinklers the maximum hight of building is 13,7m. Is it measure from floor to the bottom or top of trapezoid sheet??
I've got a problem with building's hight. The first layer of deck is metal deck,trapezoid sheet. There is installed ESFR system. The distance from floor to the bottom of sheet is 13,7m. The height of trapezoid sheet is 135mm. And it is my question:
For ESFR sprinklers the maximum hight of building is 13,7m. Is it measure from floor to the bottom or top of trapezoid sheet??