moosetracks555
Electrical
- Jun 26, 2008
- 40
I am having a difficult time coming up the savings figure for the following situation. I am almost certain the solution is a rate calculation involving calculus. However, it has been so long I don’t know where to start.
We have logs that degrade when not sprinkled with water. Our inventory has grown and we have more logs than capacity to sprinkle. We estimate a 2% / week loss on logs that are not sprinkled. I am trying to find the cost savings of adding some additional capacity to our sprinkler system. We will continue to add inventory at about the same rate as consumption. However we will use the oldest logs first.
Here is a generic example…
Assume the logs cost $100 a piece
Week 1 we have 1000 logs not sprinkled, and we use 100 logs.
Week 2 we have 900 logs not sprinkled for 1 week, and we add 100 new logs
Week 3 we have 800 logs not sprinkled for 2 weeks, 100 logs not sprinkled for 1 week, and we add 100 new logs
If we upgrade the sprinklers we will have 500 logs not sprinkled
Week 1 we have 500 logs not sprinkled, and we use 100 logs.
Week 2 we have 400 logs not sprinkled for 1 week, and we add 100 new logs
Week 3 we have 300 logs not sprinkled for 2 weeks, 100 logs not sprinkled for 1 week, and we add 100 new logs
How would you calculate a cost savings?
We have logs that degrade when not sprinkled with water. Our inventory has grown and we have more logs than capacity to sprinkle. We estimate a 2% / week loss on logs that are not sprinkled. I am trying to find the cost savings of adding some additional capacity to our sprinkler system. We will continue to add inventory at about the same rate as consumption. However we will use the oldest logs first.
Here is a generic example…
Assume the logs cost $100 a piece
Week 1 we have 1000 logs not sprinkled, and we use 100 logs.
Week 2 we have 900 logs not sprinkled for 1 week, and we add 100 new logs
Week 3 we have 800 logs not sprinkled for 2 weeks, 100 logs not sprinkled for 1 week, and we add 100 new logs
If we upgrade the sprinklers we will have 500 logs not sprinkled
Week 1 we have 500 logs not sprinkled, and we use 100 logs.
Week 2 we have 400 logs not sprinkled for 1 week, and we add 100 new logs
Week 3 we have 300 logs not sprinkled for 2 weeks, 100 logs not sprinkled for 1 week, and we add 100 new logs
How would you calculate a cost savings?