ashhafPE
Structural
- Mar 24, 2005
- 41
I am replacing a bridge built in the 40's. I determined the Q's using HEC-HMS (scs method) and compared it to the regression equ. (both were close). I used HEC-RAS and analyzed existing condition and proposed condition. The problem is the existing condition showed W.S.=79' while FEMA is showing 76'. I double cheched my Tc. Based on history, Water never overtopped the bridge or roadway. I know there is a difference of 1' in datum. Any suggestions? Also someone suggested I use HEC2. Doesn't HEC-RAS do what HEC2 did and more?