i have a model set up, which i have run for SCS storms. i would like to bring in 15 minute rainfall data for a month, and re-run my basin model for that rainfall period. i could bring the rain gage data in through time series manager, but cannot create a run using it. any help/ideas to point me in the right direction will be much appreciated.
 
Hello,

I am developing a research project in the field of hidrology. In order to obtain the peak flood flow values for different return periods to a watershed, I have generated a hidrological model in HEC-HMS, but I can create a simulation run. what steps I must take to see results of my model?

How to make an optimization trial? What is its function?

Thanks
Sophy
 