Tek-Tips is the largest IT community on the Internet today!

Members share and learn making Tek-Tips Forums the best source of peer-reviewed technical information on the Internet!

  • Congratulations TugboatEng on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Hec 23 - scour countermeasures

Status
Not open for further replies.

jojolli

Structural
Joined
Oct 9, 2001
Messages
3
Location
US
I am looking at designing countermeasures for scour at a vertical wall bridge abutment. I am looking at the equations in Hec 23 and I am a little confused. There are 2 equations to determine the required D50 of the rip rap. If the Froude number is less than 0.8 then this equation is to be used:

D50/y = (k/(Ss-1))*(v^2/gy)

if the froude number is greater than 0.8 then this equation is used:

D50/y = (k/(Ss-1))*(v^2/gy)^0.14

These 2 equations give very different results because of the ^0.14. The only variable that changes is the k variable. Does this make sense? Should the equation for a Fr # less than 0.8 be raised to a power as well? I know the above equations are confusing in this format. To get a better view look here:


The equation and info is listed on page 303 of the pdf.