saising13
Mechanical
- Aug 5, 2014
- 2
Dear Members
I am new Piping Designer
Please help me about the technologies & design for HFO unloading pipeline
I also get confusing about Unloading HFO from the Barge,
Project requirement:
- 6'' dia. pipeline / total = 1800m / unloading from Barge at Jetty and delivery to Storage Tank.
HFO specs: Density=970 kg/m3 / Viscosity=180cSt / Operation temp.=50 C deg./ Suction velocity=0.9 m/s; discharge velocity=1.26 m/s ; Pumping pressure. = 12.4 bar;
+ The Barge 400DWT without Heating System attached,
**Question??
a) How to heating the Oil in the Barge (400DWT) when approaching to Jetty at Initial temp.=6-12C deg.?
b) How to calculation and determine that 6'' dia. pipeline needed Heat Tracing / Insulation or not?
and If really needed heat tracing then which method is the best for HFO pipeline
c) How to Flushing and Cleaning the HFO oil left inside the pipeline after unloading is completed.
I do not know that just leaving the pipeline with full HFO or must clean it out and the pipeline is empty clean??? which solution is the best ??? and how about the procedure to design and operation.
Thermal Power Plant project location based in Vietnam
Thank in advance
LONG, Junior Piping Designer
I am new Piping Designer
Please help me about the technologies & design for HFO unloading pipeline
I also get confusing about Unloading HFO from the Barge,
Project requirement:
- 6'' dia. pipeline / total = 1800m / unloading from Barge at Jetty and delivery to Storage Tank.
HFO specs: Density=970 kg/m3 / Viscosity=180cSt / Operation temp.=50 C deg./ Suction velocity=0.9 m/s; discharge velocity=1.26 m/s ; Pumping pressure. = 12.4 bar;
+ The Barge 400DWT without Heating System attached,
**Question??
a) How to heating the Oil in the Barge (400DWT) when approaching to Jetty at Initial temp.=6-12C deg.?
b) How to calculation and determine that 6'' dia. pipeline needed Heat Tracing / Insulation or not?
and If really needed heat tracing then which method is the best for HFO pipeline
c) How to Flushing and Cleaning the HFO oil left inside the pipeline after unloading is completed.
I do not know that just leaving the pipeline with full HFO or must clean it out and the pipeline is empty clean??? which solution is the best ??? and how about the procedure to design and operation.
Thermal Power Plant project location based in Vietnam
Thank in advance
LONG, Junior Piping Designer