MIKEY101DOH
Mechanical
- May 12, 2008
- 13
im designing a mechanical skid package (pipework, valves, storage tank)with pressure and level transmitters included. The skid is located in a safe area. Why would the clients consultant want instruments certified as suitable for Zone 2 IIB T3 ?