surjaan
Structural
- Nov 20, 2009
- 27
I have a decorative handrail post 42" high , 4 ft spacing connected to 2-2x4 members at the base. The connection is made thru 2 threaded bolts embeded in the post and lag in the base members.
With the moment of 8400 # in and lag screw spacing only 2" it is difficult to use lag screws. Any suggestions ?
Homeowner would not like side connections.
With the moment of 8400 # in and lag screw spacing only 2" it is difficult to use lag screws. Any suggestions ?
Homeowner would not like side connections.