The situation is this:
I start with a block of material that is machined in house. It is sent out for specialized machining to vendor A. Then it comes back and is sent for specialized machining to Vendor B. Then it comes back and is finished in house.
What's the best way to handle this? Should each drawing have a made from note on it? Then, I need to include the rev on the made from note and linking that is a pain. Should the drawings all be independent and I have to specify each drawing in a manufacturing work order?
Thanks for your thoughts.
I start with a block of material that is machined in house. It is sent out for specialized machining to vendor A. Then it comes back and is sent for specialized machining to Vendor B. Then it comes back and is finished in house.
What's the best way to handle this? Should each drawing have a made from note on it? Then, I need to include the rev on the made from note and linking that is a pain. Should the drawings all be independent and I have to specify each drawing in a manufacturing work order?
Thanks for your thoughts.