8vb76
Geotechnical
- Oct 31, 2008
- 1
I have a project in Piedmont geology in Virginia (bedrock is schist/gneiss) where I'm recommending that steel (grade 50) H-Piles be founded on bedrock (some in groups of up to 4 piles/cap). The schist/gneiss bedrock is of relatively good quality (generally above 60% RQD). IBC 2003 indicates that allowable axial stresses on steel piles should not exceed 35% of the steel yield strength. Where justified, axial stress is permitted to be increased above 35% but not greater than 50%.
Questions for both you geotech & structural folks out there:
1) Is it excessive to design an H-Pile group based on let's say, 45% of yield stress?
2) If dynamic testing is to be used to confirm drivability criteria and capacity, should I expect a PDA device to be able confirm a pile capacity on the order of about 300-350 tons?
H-Piles are unfortunately relatively new to me. Thanks for any help in advance!
Questions for both you geotech & structural folks out there:
1) Is it excessive to design an H-Pile group based on let's say, 45% of yield stress?
2) If dynamic testing is to be used to confirm drivability criteria and capacity, should I expect a PDA device to be able confirm a pile capacity on the order of about 300-350 tons?
H-Piles are unfortunately relatively new to me. Thanks for any help in advance!