Antnyt23
Structural
- Jul 11, 2012
- 81
In guyed tower analysis in accordance with TIA-222-G I see no reference to a safety factor of 2.0 for guyed wires, however, I have read and heard some places where this was common practice (not sure if maybe this was with previous standards). In TNX Tower the stress ratio for guys and wind when TIA 222-G is selected is locked at 1.0 so was just hoping to get a little clarification from the experts.