I am designing a septage recieving station at a WWTP. It is a small .5mgd wwtp. How much septage should be added to the secondary treatment (A-O)? And how should grease, grit and trash be removed from septage economically. The price of the smallest Lakeside Total Plant with grease removal is $210,000.