customfab
Bioengineer
- Jan 25, 2010
- 3
Can someone tell me how to get graphical indicators to work at a rolled-up level? I get can them to show up only at a task level but not at a sub-project or project level (rolled up tasks).
Look at this link. The yellow cells show the location where I would like indicators to show up.
Look at this link. The yellow cells show the location where I would like indicators to show up.