good morning
we are facing problem at site for achieving the below shell DEP requirement for the tank foundations sand compaction
The first sand layer shall be compacted with a
plate vibrator to achieve a minimum strength or density of 5 MPa or 98 % Proctor.
The thickness of the compacted layer shall not exceed 0.3 m. The sand shall be
placed and compacted at Optimum Moisture Content ± 2 %.
note the sand saving show 99% less than 5 mm passing
if any recommendation how to achieve this value please help
regards
we are facing problem at site for achieving the below shell DEP requirement for the tank foundations sand compaction
The first sand layer shall be compacted with a
plate vibrator to achieve a minimum strength or density of 5 MPa or 98 % Proctor.
The thickness of the compacted layer shall not exceed 0.3 m. The sand shall be
placed and compacted at Optimum Moisture Content ± 2 %.
note the sand saving show 99% less than 5 mm passing
if any recommendation how to achieve this value please help
regards