haynewp
Structural
- Dec 13, 2000
- 2,329
I have a soils report from a geotech I haven't worked with before where H pile capacities are given as ultimate capacities. I remember previously getting reports that listed the allowable capacity or what F.S. to apply to the ultimate capacities given. I had to call the geotech to get the recommended F.S. for the piles and he suggested to use about 2. What is the point of giving a soils report with ultimate pile capacities when the allowable capacities are needed for the foundation design?