Pmatherne
Mechanical
- Mar 11, 2009
- 52
I am trying to do a worst case discharge on a pipeline that is primarily gas. there will be a little bit oil compared to the gas in the system. 135 MMSCF and only about 5500 BOPD
The problem I am having is you have to take the volume of the pipeline, which is a 36" OD and over 360,000 feet long in the last leg when it come in from offshore. So I am coming up with a WCD over 80,000 bbls when the most the line will hold is about 30,000 bbls (Assuming it takes the gas 5 days to get to shore)
Does anyone know if there is an alternative version to use for gas pipelines
Future PE Engineer
Pet project I am working on to help other engineers, not much yet hoping to get it grow as I learn more
The problem I am having is you have to take the volume of the pipeline, which is a 36" OD and over 360,000 feet long in the last leg when it come in from offshore. So I am coming up with a WCD over 80,000 bbls when the most the line will hold is about 30,000 bbls (Assuming it takes the gas 5 days to get to shore)
Does anyone know if there is an alternative version to use for gas pipelines
Future PE Engineer
Pet project I am working on to help other engineers, not much yet hoping to get it grow as I learn more