RFreund
Structural
- Aug 14, 2010
- 1,885
There is a remodel of an existing structure. The existing structure has a partial height basement wall and they will be excavating to install a walkout basement area. Therefore a new 'frost wall' is required. See attached sketch options. I'am curious what is the best way to do this. I suppose any of the options could work as the final grade is still above the bottom of the existing footing. Any comments are welcome.
Also I'm curious if anyone has used insulation to avoid having to excavate the full depth?
Thanks
EIT
www.HowToEngineer.com
Also I'm curious if anyone has used insulation to avoid having to excavate the full depth?
Thanks
EIT
www.HowToEngineer.com