The project site has a design frost penetration depth of 3.7 meters. The recommended adfreeze uplift force on the sides of pile is quite large (100 kPa). I'm thinking of tar-coating the top 4.7 meters of my H-pile. Is this (tar-coating) a common practice in the cold region area? I also want to know, from the long-term point of view, how much frost jacking force i still need to consider in the uplift capacity design for the top 3.7-meter coated part.
Any information and comments would be greatly appreciated.