MalinQC
Mechanical
- Oct 30, 2009
- 11
I wrote a QC manual for AISC SImple bridge certification and was preparing for that audit, but found out I had to upgrade to Major bridge with a Fracture critical endorsement. I have no problem updating the manual to encompass the few changes between Simple and Major, but writting a Fracture control plan is presenting a problem. For instance, I am not sure what format to take, and what things HAVE to be in it. I realize there are a lot of SHALL and WILL (s) outlined in the subclause 12, so which ones do I encompass and undertake. It says this starts with and is mainly focused on design. We don't have that function in house and thus subcontract it out. What do I say about that, just that as part of my subcontracting procedure I will ensure that the design engineer must provide past evidence of fracture critical member design?