ZTGR
Geotechnical
- Apr 23, 2003
- 17
Hello all,
an over-excavation been done for a footing designed for 10 kips/ft2. the footing suppose to be at 3 feet above the existing over-excavated bottom. a footing for such a high pressure should be on native rock, the bottom of the over-ex is native claystone. the contractor is planning to place 2000 psi concrete slurry to bring bottom of footing to initial level. is this acceptable geotechnically?
Thank you
an over-excavation been done for a footing designed for 10 kips/ft2. the footing suppose to be at 3 feet above the existing over-excavated bottom. a footing for such a high pressure should be on native rock, the bottom of the over-ex is native claystone. the contractor is planning to place 2000 psi concrete slurry to bring bottom of footing to initial level. is this acceptable geotechnically?
Thank you