We are looking at a project that involves an addition to an existing instituitional occupancy(University)in Ontario Canada. Existing flow tests indicate available flows as follows:
Static 68 PSI
Test 1-50 PSI @ 223 USGPM
Test 2-39 PSI @ 416 USGPM
Test 3-13 PSI @ 538 USGPM
Existing Hydraulic calculations show a most demanding area calc for the boiler room requiring 23.1 PSI @ 247.12 usgpm @ BOR plus 250 USPM hose allowance. What flow test results should have been used for this system design?
Thanks in advance.