Flarenuf
Computer
- Mar 26, 2003
- 10
Hi all
Struggling to find anything on this in my vast library of paperwork or indeed on the net.
Fired furnace upstream of crude unit , power failure scenario, furnace goes offline .
Overhead vapour line from furnace still feeds into column. What % if any of the residual heat in the furnace should be applied to the remaining liquids in the furnace to continue vaporisation , and , for how long.
Found one reference that says 40% of design and for 1 hr ...seems high to me , any thoughts from experienced members please?
thanks
Flarenuf
Struggling to find anything on this in my vast library of paperwork or indeed on the net.
Fired furnace upstream of crude unit , power failure scenario, furnace goes offline .
Overhead vapour line from furnace still feeds into column. What % if any of the residual heat in the furnace should be applied to the remaining liquids in the furnace to continue vaporisation , and , for how long.
Found one reference that says 40% of design and for 1 hr ...seems high to me , any thoughts from experienced members please?
thanks
Flarenuf