hakbak
Chemical
- Mar 1, 2005
- 2
Hi,
I have commenced work for a food and beverages company. It consists of 5 different processing plants, within the same site. It has some level of process control but there is no automatic data logging at all. I am proposing a fully integrated Scada and PLC system to have all processes linked and controlled via a network of MMI. Is this the right joice? The head office and processing plants are at different locations.
I have commenced work for a food and beverages company. It consists of 5 different processing plants, within the same site. It has some level of process control but there is no automatic data logging at all. I am proposing a fully integrated Scada and PLC system to have all processes linked and controlled via a network of MMI. Is this the right joice? The head office and processing plants are at different locations.