Cristian N
Petroleum
- Jan 10, 2017
- 16
I was wondering if anyone had experience performing external settlement surveys on in-service storage tanks. I see a lot of 3rd party inspection companies tend to incorporate settlement surveys in their external visual inspection reports.
[ul]
[li]I know API 653 has minimum required points in accordance with the tank's diameter.[/li]
[li]Edge settlement surveys are performed during out of service/external inspections.[/li]
[/ul]
Essentially, what I am asking is, are settlement surveys performed from the outside, really effective? If they are, how effective are they on a double bottom tank?
[ul]
[li]I know API 653 has minimum required points in accordance with the tank's diameter.[/li]
[li]Edge settlement surveys are performed during out of service/external inspections.[/li]
[/ul]
Essentially, what I am asking is, are settlement surveys performed from the outside, really effective? If they are, how effective are they on a double bottom tank?