AAEC
Civil/Environmental
- Nov 22, 2006
- 42
We had just demo the existing concrete slab which was damage due to upheaving from swelling of soil materials (clay type soil. What should I do with the existing soil before we place the new concrete slab? Should I take a sample and get a proctor on it and re-condition and re-use it? Should I replace it with basecourse that do not absorb to much water?