COEngineeer
Structural
- Sep 30, 2006
- 1,186
I need to connect a new wall into existing wall. The thing is I am connecting it it in the middle of the wall span. How do I know that dowel epoxied 6" into the existing at 16" o.c. is good enough to make the combined wall as one unit (instead of a hinge point in the middle). My new wall is going to be reinforced 16" o.c. both directions. How do I figure out the development length of the epoxied #5 rebar?