I'm involved in a project with an existing floor condition. The live load is 50psf. The owner wants to place a 3100# prefab hearing booth within the space and also a file cabinet. The booth is 4lf by 5 lf (approx. 150psf) and the file cabinet is 1000# (approx. 1.5lf by 2lf).
Is is appropriate to relate the booth load of 150psf to the floor live load of 50psf?
Is is appropriate to relate the booth load of 150psf to the floor live load of 50psf?