Hello all,
I have a site that is being prepared for a walkout basement. The excavation, however, may end up being completed six months before construction will begin on the foundation in spring 04.
What steps, if any, do I need to take to ensure the integrity of the site. The soil is a rocky highfield loam. I had been considering putting down a foundation drainage with laterals 7' apart along with the stone, however, since the site is in Pennsylvania and will likely see snow/ice, I'm not sure that is going to be enough. Any input would be appreciated.
I have a site that is being prepared for a walkout basement. The excavation, however, may end up being completed six months before construction will begin on the foundation in spring 04.
What steps, if any, do I need to take to ensure the integrity of the site. The soil is a rocky highfield loam. I had been considering putting down a foundation drainage with laterals 7' apart along with the stone, however, since the site is in Pennsylvania and will likely see snow/ice, I'm not sure that is going to be enough. Any input would be appreciated.