nivoo_boss
Structural
Hey everyone!
So I designed a new foundation next to an existing one. The new one is to be settled about 1,6 m below the existing 1,4x1,4 m pad. It is close to the existing one. The load from the existing foundation is around 70 kN.
Do you have any rules of thumb when slope stability becomes an issue here? The existing one has settled for about 12 years. The soil is dry. A picture is below. The red arrow points to the existing one, the green one to the new one.

So I designed a new foundation next to an existing one. The new one is to be settled about 1,6 m below the existing 1,4x1,4 m pad. It is close to the existing one. The load from the existing foundation is around 70 kN.
Do you have any rules of thumb when slope stability becomes an issue here? The existing one has settled for about 12 years. The soil is dry. A picture is below. The red arrow points to the existing one, the green one to the new one.