Hi all,

I am trying to convert a project file from ETAP to SKM. Below is the ETAP utility operating value and also SC value. Which value I should key in to SKM setting? Should be SC value, right? The analysis should consider the higher current that go the system. Correct me if I am wrong.

Operating_pj5bzs.png
SC_eutkxw.png
skm_zibyve.png
 
Hello Frankie August

See attached file calculations for PTW Utility input data.
The calculations assume an IEC 60909-0 voltage factor of 1.0

Eddy Wirbelstrom
 
Hi Eddy,

Thanks for your reply. Great information.

Regards,
Frankie
 