ej4321
Computer
- Mar 15, 2005
- 3
I would like to know how to estimate the complexity of the following job.
Current conditions:
Existing 4 story brick row house on a rubble stone foundation. Cellar height about 6 feet. Built mid-19th century. Brick extention, no cellar. House is located between 20 story building and another 4 story structure (party wall)
Needed:
Excavate existing cellar to 9 feet, create the 9 foot high cellar under the extention.
The groud floor will be vacant during the construction, the rest of the house occupied.
Current conditions:
Existing 4 story brick row house on a rubble stone foundation. Cellar height about 6 feet. Built mid-19th century. Brick extention, no cellar. House is located between 20 story building and another 4 story structure (party wall)
Needed:
Excavate existing cellar to 9 feet, create the 9 foot high cellar under the extention.
The groud floor will be vacant during the construction, the rest of the house occupied.