I have a job that has concentric brace frames. During erection, the erector decided that it would be a good idea to cut the gusset plates in order to fit the bracing into the proper location (see attached picture). They cut these holes into all the gusset plates around the building.
I would like to have this fixed but am not sure about how to go about doing it. I believe new gusset plates should be installed but this would require a lot of field work. I’m also not sure if this is realistic or not.
The erector would like to CJP a new section of plate that he removed in order to set the brace. I’m not convinced that this can be done properly in the field.
Has anyone run into this problem before? If so, how did you go about fixing the problem?
I would like to have this fixed but am not sure about how to go about doing it. I believe new gusset plates should be installed but this would require a lot of field work. I’m also not sure if this is realistic or not.
The erector would like to CJP a new section of plate that he removed in order to set the brace. I’m not convinced that this can be done properly in the field.
Has anyone run into this problem before? If so, how did you go about fixing the problem?