ONENGINEER
Geotechnical
- Oct 13, 2011
- 284
I have a soldier pile walls with concrete infilled stell pipe piles. I want to replace the steel pipes (filled with concrete) with an I beam section. How can I for=und the equivalent size of the I beam. Should it be the memont of inertial criteria or else? Is there an online conversion table? Thank you.