movasra
Structural
- Nov 15, 2007
- 23
Hi!
Can anybody tell me if we have to consider the operating weight of the equipment as Live Load + Dead Load? another word, should we multiply Cs by the operating weight to obtain the Seismic Load or just multiply by the empty load? could you refer me to CBC 2007 or AISC 7-05.
Thanks a lot