Hello everyone
in our project specification, we specify that the EOT (overhead crane) will cover the full area of the shelter where the turbocompressor package is installed (gas turbine+ centrifugal compressor). the contractor said that we don't need the EOT to cover the turbine Area because the vendor of the turbines(" SIEMENS or SOLAR)will come with its own crane to do the maintenance required "ex: removal of GG". so the EOT crane will be limited only to the centrifugal compressor area.
my concern if there is any maintenance actions that requires the use of EOT in the turbine area.
what are your suggestions?
in our project specification, we specify that the EOT (overhead crane) will cover the full area of the shelter where the turbocompressor package is installed (gas turbine+ centrifugal compressor). the contractor said that we don't need the EOT to cover the turbine Area because the vendor of the turbines(" SIEMENS or SOLAR)will come with its own crane to do the maintenance required "ex: removal of GG". so the EOT crane will be limited only to the centrifugal compressor area.
my concern if there is any maintenance actions that requires the use of EOT in the turbine area.
what are your suggestions?