ONENGINEER
Geotechnical
- Oct 13, 2011
- 284
1. Lining is required to place in the base of a mine waste rock fill of 10 m high and a slope of 3:1.
Commercial product specifications are available. From an engineering point of view what are the main parameters to consider to choose among various products?
2. What would be a desirable alongation to break?
Thank you.
Commercial product specifications are available. From an engineering point of view what are the main parameters to consider to choose among various products?
2. What would be a desirable alongation to break?
Thank you.