I designed some precast concrete wall systems for a client who plans to re-use the design for future projects. The walls and footings will need to be checked and possibly re-designed for various conditions. Each structural package should be fairly easy to put together. I want to propose a sensible fair pricing structure for the future. The project sizes will vary from under one hundred feet of wall to a mile or so. Any suggestions?
 
I like to charge a minimum of 50% of the original fee for redo/reuse. You still have all the same liabilities, and also probably have to review shop drawings. If there will be many reuses, you may consider taking a little less if the client balks.
 
What about different wind conditions at each site?

There may actually be a price advantage to get the sites redesigned.
 
There will be different wind, seismic and/or soil conditions.

I'm wondering what I should charge in the case of a really large re-use. I'll most likely be providing the site plan also. I'm thinking about a percentage of the job to a maximum. What if I proposed a set fee per job up to 200' of walls? Then added 30% of the original cost for the next 200', then 20% for the next 200', then 10% for the next 200' for each additional 200'.
 
This is not a proper question for a technical forum. Charge whatever you feel is reasonable.

BA
 
But interesting nonetheless and something common to the profession... I usually go for 50% for first redesign and 35% for all subsequent...

Dik
 
There is a certain amount of work required to excercise due diligence regardles of whether or not a redesign is required.

10% is far too little in my opinion.
 
Thanks everyone for your input. I think I'll set up a tiered pricing structure.
 