jimioy
Electrical
- Dec 17, 2003
- 22
We have about 45 facilities each averaging about 30 emergency fixtures - predominately 2X4 T8 Troffers and as of late, T5HO pendants. Our problem is that 90% of them aren't self diagnosing so we do the yearly 90 minute burn test. We have about a 20% failure rate, about half of those battery issues and half chargers. I am beginning to think I need to seriously look into an invertor type system or anything to get away from having to spend all my man hours on changing out Bodine ballast. I know they are a lot upfront - equipment and pipe/wire reconfiguration, but I know what I'm doing now is killing me. Any thoughts?