Tek-Tips is the largest IT community on the Internet today!

Members share and learn making Tek-Tips Forums the best source of peer-reviewed technical information on the Internet!

  • Congratulations cowski on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

EMBEDDING BREAKWATER

Status
Not open for further replies.

ANSIF

Geotechnical
Joined
Jun 20, 2001
Messages
42
Location
MX
Dear colleagues, any suggestion to broadly estimate the embedding which can report a breakwater built on a seabed composed of loose sand, N from 2 to 8 blows, and 8 to 10 m thick.

By "embedding" I mean the effect of shifting sandy soil due the falling speed of rock fragments on the seabed and the same weight of material accumulation.

The breakwater is planned with a maximum height of 25 m, from the seabed, where the water depth is about 20 to 22 m.

I appreciate your comments.
 
Please refrain from duplicate postings

TTFN
faq731-376
Need help writing a question or understanding a reply? forum1529


Of course I can. I can do anything. I can do absolutely anything. I'm an expert!
There is a homework forum hosted by engineering.com:
 
Status
Not open for further replies.

Part and Inventory Search

Sponsor

Back
Top